Skip to main content

+43 6245 21661-0 · office@hr-automation.at

Mo–Do 08:00–12:00 / 13:00–17:00 · Fr 08:00–12:00

Mon–Thu 08:00–12:00 / 13:00–17:00 · Fri 08:00–12:00

Alzkraftwerke Heider | Hydropower

REFERENCE · HYDROPOWER

Alzkraftwerke Heider

Our cooperation with Alzkraftwerke Heider reflects long-standing experience with automation in hydropower plants. A project in 2015 included modernization of a SIMATIC PCS 7 system from V6.x to V8.0.

Project context

The project focused on modernizing process control in an existing hydropower plant. In this type of brownfield work, installed structures, interfaces and shutdown windows need to be considered together.

  • Industry: hydropower.
  • Scope: electrical automation and process control.
  • Project status 2015: migration from SIMATIC PCS 7 V6.x to V8.0.
  • Focus: brownfield modernization.

Similar hydropower plant?

Send system version, plant context and planned modification.