The drawing is not always the actual plant
Years of extensions, troubleshooting and temporary modifications can create gaps between documentation and reality. We therefore treat the installed-base survey as a dedicated engineering step.
What we capture before retrofit
The assessment goes beyond CPU type and software version. I/O, networks, fieldbuses, panels, third-party systems, safety functions, backups and shutdown constraints all influence the migration path.
A reliable baseline creates a plan
Once the current state is understood, it becomes much easier to decide whether partial modernization, staged migration or a larger system replacement is appropriate.
Assess retrofit risk early
Share a system overview, available drawings and the desired target state. We can then define the next engineering step.