
The first discussion does not require a full specification
A short plant description, the existing automation platform and the target are usually enough to begin. From there, we can identify which documents are needed for the next technical step.
Useful information
Helpful inputs include turbine and generator context, PLC and process-control systems, protection and auxiliary systems, communication links, available drawings, remote access and the planned shutdown window.
The scope can then be defined properly
Depending on the installed base, the project may range from a focused software modification to a comprehensive retrofit. We assess which steps make technical sense and which disciplines are required.
Discuss a hydropower project
Send a short plant overview and the planned modification. We will come back with an initial technical assessment.



Schreibe einen Kommentar